Rework Operations

Controlled handling of returned goods, rejected goods and non-conforming products.

01

Purpose & Objective

Recover usable stock without compromising conformity or traceability.

Establish a consistent method for receiving, identifying, containing, inspecting, assessing, reworking, verifying and disposing of returned or rejected products. Prevent unintended use or release of non-conforming goods and retain evidence of every decision.

Internal process framework • Subject to company approval

02

Scope of Work

Two incoming streams, one controlled disposition process.

Returned Goods

Customer/dealer returns involving faults, incorrect or missing components, fitment issues, damage, or no-fault-found cases. Link each item to its RMA and reported concern.

Rejected Goods

Items rejected at incoming inspection, production, assembly, testing or final inspection. Link each item to its NCR, lot and point of detection.

Rework & Repair

Rework restores full conformity to the original approved requirements. Repair is a separate, authorised disposition where full original conformity may not be restored.

Inspection & Release

Check identification, physical condition, unique configuration, completeness, electrical/functional performance and applicable compliance requirements before authorising release.

03

Controlled Workflow

From receipt to traceable closure.

  1. Receive and register: Record part ID, quantity, return/reject reason, batch/serial, date and reference number.
  2. Identify and contain: Tag HOLD / NON-CONFORMING and segregate from released stock.
  3. Inspect and test: Review appearance, identification, configuration, completeness and relevant performance.
  4. Determine disposition: Quality/Engineering authorises rework, repair, NFF/serviceable release, supplier return, concession or scrap as applicable.
  5. Execute approved work: Use controlled instructions, trained personnel and documented materials/operations.
  6. Retest and verify: Record results against the applicable acceptance criteria; failed verification returns to HOLD.
  7. Approve and close: Obtain release authorisation, update inventory and close RMA/NCR and supplier actions.
04

Work Plan & Ownership

Suggested responsibilities; confirm with department leads.

StageRequired actionSuggested owner
01 • ReceiptRegister product, reason, quantity and traceabilityWarehouse / Quality
02 • ContainmentIdentify and quarantine affected stockWarehouse / Quality
03 • AssessmentInspect, test and document defect or NFFQuality / Engineering
04 • PlanningApprove feasibility, instructions, resources and dispositionEngineering / Quality
05 • ReworkPerform authorised correction and maintain recordsProduction / Rework
06 • VerificationRetest and verify specification complianceQuality / Testing
07 • ReleaseApprove disposition and update inventoryAuthorised Quality / Warehouse
08 • ClosureClose NCR/RMA; escalate supplier-related failuresQuality / SQE / Purchasing
05

Mandatory Quality Controls

Apply to both returned and rejected goods.

Part Identification

Verify part number, serial/batch, revision, compliance plate and barcode against approved records.

Physical Appearance

Inspect scratches, dents, corrosion, surface finish, damage and packaging against acceptance criteria.

Product Uniqueness

Confirm variant, configuration, terminal positions, accessories and product-specific requirements.

Release Authority

No release without documented verification and the required Quality/Engineering approval. Regulated or safety-critical modifications require specific authorisation.

06

Performance & Continuous Improvement

Recommended metrics and implementation milestones.

KPIs: quantity received, rework success rate, first-pass yield after rework, turnaround time, repeat non-conformances, scrap rate, cost of poor quality and supplier recovery.

PhaseTargetDeliverable
Week 1Define scope and responsibilitiesApproved ownership matrix
Week 2Set up quarantine and identificationHOLD labels and registration process
Weeks 3–4Develop instructions and acceptance criteriaControlled work and test instructions
Weeks 5–6Pilot selected product familiesRecorded rework and retest results
Week 7Review and formaliseApproved process, training and reporting

Related Quality Application

Use the existing electrical component test report to document the inspection and testing of applicable returned products.

Open Electrical Test Report →

This page is a process guide, not an electronic approval or database system. Apply your company's controlled-document and authorisation procedures.